|
|
|
Productos
|
|
Información
|
|
Destacado
|
|
- GENERAL
- Location of Controls (XR - 3750)
- Location of Controls (XR - C350)
- Installation
- Connections
- DISASSEMBLY
- ASSEMBLY OF MECHANISM DECK
- MECHANICAL ADJUSTMENTS
- ELECTRICAL ADJUSTMENTS
- Test Mode
- Tape Deck Section
- Tuner Section
- DIAGRAMS
- IC Pin Function Description
- Printed Wiring Boards - Main Section
- Schematic Diagram - Main Section
- Printed Wiring Board - Key Section
- Schematic Diagram - Key Section
- EXPLODED VIEWS
- ELECTRICAL PARTS LIST
No hay comentarios de productos.
SECTION 3 ASSEMBLY OF MECHANISM DECK
Note: Follow the assembly procedure in the numerical order given.
ALIGNMENT OF FRONT SWITCH
hole
1 Align ¢ mark on the rotary switch the position shown in the figure.
chassis (S) ass�y
2 Align hole in the gear (LDG-D) with the position shown in the figure.
GEAR (LDGE)
1 Align hole as shown in the figure. 2 Install the gear (LDG-E).
� 12 �
|
|
 |
> |
|