|
Usuarios conectados
Actualmente hay 5928 visitantes y 1 usuarios online.
|
Productos
|
Información
|
Destacado
|
|
|
|
|
No hay comentarios de productos.
VDR-D210P / VDR-D220P / VDR-D230P / VDR-D210PC / VDR-D220PC / VDR-D230PC
13. Installation of LCD Panel, Reflect Sheet, Lead Light Panel, Diffusion Sheet, BEF Sheet, BEF Sheet A and Panel Holder Unit a. When replacing the LCD Panel, the Diffusion Sheet, the BEF Sheet and the BEF Sheet A, make sure to remove the Protection Sheets. To distinguish Sheets from attached Protection Sheet: - A blue Protection Sheet is affixed to both faces of the Diffusion Sheet. - A green Protection Sheet is affixed to both faces of the BEF Sheet. - A green Protection Sheet is affixed to both faces of the BEF Sheet A.
Protection Sheet (blue) Diffusion Sheet
Reflect Sheet
Adhesive tape Lead Light Panel
Diffusion Sheet (white)
BEF Sheet
Protection Sheet (green) BEF Sheet
(stripe)
BEF Sheet A
Protection Sheet (green) BEF Sheet A
(stripe)
Panel Holder Unit Portion A Adhesive tape Portions B LCD Panel
b. Use extreme care when handling the LCD Panel, the Reflect Sheet, the Lead Light Panel, the Diffusion Sheet, the BEF Sheet and the BEF Sheet A to avoid damage, dust, and spots (especially fingerprints, etc.) Install in order shown below. 1) Install in order: the BEF Sheet A, BEF Sheet and Diffusion Sheet while fitting the corners of each sheet into the corners of the Panel Holder Unit. 2) Install the Lead Light Panel while fitting the corners into the corners of the Panel Holder Unit. 3) Place the Reflect Sheet so it is aligned with Portion A of the Panel Holder Unit, then install it using the adhesive tape portions of the Reflect Sheet.
Do not touch the surface of Lead Light Panel.
Adhesive tape
Fig. D13-2
Adhesive tape Adhesive tape
Reflect Sheet Panel Holder Unit
Fig. D13-1 4) Install the LCD Panel with adhesive tape so it is aligned with Portions B of the Panel Holder Unit.
32
|
|
|
> |
|