(3) Wiring of power (for assembling the board block sub assembly) (c) Outline ballast board after it has been placed on top of the power board. (a) Wiring ballast block before it is placed on top of the power board.
Squeeze CNPWR cables into left hand side of the block before connecting the power air intake fan, Connect CNPWR to CN1 also make sure that the CNBAR cables have been passed connector, and make sure that it through the ballast holder slots. is perfectly locked. Ballast board
CN1
Power board CNPWR CNBAR Power air intake fan
#3054
TLP-SX3500(P5SX+)
31
Make sure that the CNBAR does not droop on top of the ballast board. (Maintain a safe distance.) (Prevents the CNBAR from coming into contact with the fan blades.)
Lamp Make sure that the lines do Run lamp leads in the power leads block's grooves.
(b) Wiring ballast board when it is placed on top of the power board.
Pull CNPWR cables to left (in direction of arrow in the CNTH diagram below), when placing ballast board on top of the power board. #3054 (The cables may come into contact with spinning blades of the power leads air intake fan to the right.)
CNBAR Ballast board
Connect the CNTH cable to the E950 sensor board's connector.
not protrude from the notch
of the ballast cover. (Prevents tangling.)
CNBAR Power board