Installation
IMPORTANT: This hob must be installed by a competent person to the relevant Gas Standards. Any gas installation must be carried out by a competent person. The manufacturer will not accept liability, should the above instructions or any of the other safety instructions incorporated in this book be ignored. WHEN THE HOB IS FIRST INSTALLED Once the hob has been installed, it is important to remove any protective materials, which were put on in the factory. On the end of the shaft, which includes the G 1/2" threaded elbow, adjustment is fixed so that the washer is fitted between the components as shown in the diagram. Screw the parts together without using excessive force.
Gas Connection
Connection to the gas supply should be with either rigid or semi-rigid pipe, i.e. steel or copper. The connection should be suitable for connecting to R 1/2� (1/2 BSP male thread). When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation. Ensure that the main connection pipe does not exert any strain on the hob.
FO 0814
FO 0264
A) End of shaft with nut B) Washer C) Elbow It is important to install the elbow correctly, with the shoulder on the end of the thread, fitted to the hob connecting pipe. Failure to ensure the correct assembly will cause leakage of gas.
Cut Out Size
The dimensions of the cut-out are given in the diagram.