No hay comentarios de productos.
CHAPTER 4 INSTALLATION
1 Selecting the Site
The site of installation must meet the following requirements; if possible, visit the user�s before delivery of the machine: 1. The site must provide with a power outlet that is rated to suit the machine and that can be used exclusively by the machine; iR8500: 100V Model (90~110V, 20A or more) / iR7200: 100V Model (90~110V, 15A or more), 208V Model (188~228V, 12A or more), 230V Model (198~264V, 13A or more). 2. The site must be between 15° and 30°C in temperature and between 5% and 80% in humidity. Particularly, be sure to avoid areas near water faucets, water boilers, humidifiers, and refrigerators. 3. The site must not be near a source of fire, subject to dust or ammonium gas, or exposed to direct rays of the sun. As necessary provide curtains. 4. The level of ozone generated by the machine will not affect the health of individuals around it. Some, however, may find its odor unpleasant as while remaining in contact with it for long hours. Be sure that the room is well ventilated. 5. Make sure that the feet of the machine will remain in contact with the floor, and the machine will be kept level. 6. Make sure that the machine will be at least 10 cm away from any walls, allowing enough space for work.
COPYRIGHT© 2001 CANON INC. 2000 2000 2000 2000 CANON iR8500/7200 REV.1 AUG. 2001
4-1
|