No hay comentarios de productos.
10) Remove the screw, and remove the rod stopper. 11) Remove the rod.
C. Assembly procedure
CCD core
1) Pass the core through the CCD-MCU harness. 2) Insert the CCD-MCU harness into the CCD PWB connector of the carriage unit.
3)
3) Move the core which was passed through the CCD-MCU harness near the CCD PWB connector as shown in the figure below, and fix it with a filament tape (19mm wide, 40mm long). For the attachment reference, refer to the figure below. Clean and remove oil from the attachment section. 4) Attach the CCD-MCU harness to the duplex tape on the back of the carriage unit. 5) Attach the PWB holder to the position specified in the figure below. 6) Pass the core through the FFC and the PWB holder, and fix the core.
2) 1)
Note: Attach the FCC to the base plate securely with duplex tape to prevent against coming loose.
12) Lift the rear side of the carriage, remove the belt and the connector, and remove the carriage.
4)
1)
2)
3)
Note: Attach the FCC to fit with the marking line.
Marking line.
AR-M150/M155/M155X DISASSEMBLY AND ASSEMBLY 8 - 6
|