Su carrito de compras está vacío
|
Productos
|
Información
|
Destacado
|
|
No hay comentarios de productos.
TRAY
1 two screws (PTPWH2.6 � 7)
2 chucking yoke (K)
6 damper (S) 7 lock lever
4 Pull the tray. 8 Remove the tray.
A
5 claw
7 lock lever 3 Rotate the control cam in the direction of arrow A.
� SUB CHASSIS INSTALLATION
Note: Follow the assembly procedure in the numerical order given. 2 Install the drive gear with gear position as shown in figure.
gear
3 screw (PTPWH2.6 � 16)
5 two screws (PTPWH2.6 � 7)
front side
4 sub chassis
1 Install the control cam with gear position as shown in figure.
gear
front side
� 10 �
|
|
 |
> |
|
|
Parse Time: 0.177 - Number of Queries: 126 - Query Time: 0.037